
Platform continuity and operations
Critical platforms are deployed with signed acceptance and operated under a service level agreement.
The demand on the operator
Signaling platforms do not tolerate interruptions. Operating them requires scarce expertise, tested contingency and clear responsibilities between the parties.
ATC's response
ATC deploys with four acceptance milestones, provides severity-based support and operates its own and third-party platforms. Network Engineering prepares the RF infrastructure.
How it operates in the network
Deployment
Four milestones with acceptance test protocols signed by both parties and a rollback plan.
Support
Severity-based support, with technical escalation defined in the agreement.
Operation
Operational responsibility transferred under a service level agreement, by platform or by element.
Results for the operator
- Continuous service of critical platforms
- Responsibilities stated in the agreement
- Contingency with a tested plan
Modules, platforms and services
Operations and service
ATC deploys with signed acceptance, provides severity-based support and operates the platform if the operator so chooses
View details ServiceOperations
Deployment, severity-based support and delegated operation
View details ServiceNetwork Engineering
RF infrastructure and LTE and 5G networks
View detailsData is processed on the infrastructure the operator designates, under its control.
ATC reviews the platform the operator prioritizes and proposes the appropriate configuration. Sizing and review are provided at no cost.
- Review of the platform and the network interfaces
- Sizing according to the operator's infrastructure
- Staged proposal: module, platform or delegated operation
3GPPGSMAITU-TTM Forum
No-cost review and sizing, without access to production.
